You can not select more than 25 topics
Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
2.3 KiB
2.3 KiB
Workspace Session
Last updated: 2026-07-09 — overwrite per handover
Active focus
GeoNetAgent (GeoNetAgent/)
IT Support + PWA ✅: migrations 009/010, API kasus+lampiran, global stats/list, asset ticket counts. PWA /support, profil device riwayat tiket, asset-mgmt owner fix. Next: QNAP S3 lampiran prod; migration 005 procurement.
mysupperapps_FE_PWA (mysupperapps_FE_PWA/ — repo terpisah)
v1.6.0 deployed ✅: IT Support tab, profil Device Saya + riwayat tiket, asset-mgmt tiket count + owner LDAP display_name. SW v8. Next: /ticketing Zammad; cleanup scripts/patch_*.
nginx (nginx/)
SSL geonet SSOT ✅: cert di .24; renewal ~Agustus 2026. Next: jangan commit cert private ke git.
Ollama / AI Onprem (Ollama/)
NAS indexing WIP (uncommitted). Next: handover terpisah jika di-commit.
Projects (session)
| Project | Version | Session summary | Status |
|---|---|---|---|
| GeoNetAgent | 0.1.19-collector-support-pwa | GeoNetAgent/docs/ai-session-summary.md | Support API+deploy |
| mysupperapps_FE_PWA | 1.6.0 | mysupperapps_FE_PWA/docs/ai-session-summary.md | IT Support PWA live |
| nginx | 1.1.0 | nginx/docs/ai-session-summary.md | SSL — uncommitted certs |
| Ollama | 0.4.0 | Ollama/docs/ai-session-summary.md | NAS WIP |
| geonet-console | ai-fase3.1 | server-connection/geonet-console/docs/ai-session-summary.md | — |
Cross-project impact
| Area | Impact |
|---|---|
collector.gisportal.id |
Support API + asset ticket counts — PWA pakai NEXT_PUBLIC_COLLECTOR_TOKEN |
my.gisportal.id |
/support, profil, asset-management — repo PWA terpisah |
PostgreSQL .25 |
asset_support_*, document_attachments, asset_change_events |
Next agent
- GeoNetAgent/AGENTS.md + ai-session-summary
- mysupperapps_FE_PWA/docs/ai-session-summary.md — repo sendiri
- Guide:
GeoNetAgent/docs/guide/asset-support-troubleshooting.md